The three parts of product cost
What one unit costs you to make has three parts. Materials are everything that goes into the product and its packaging. Labour is the time people spend making, filling and packing it. Overhead is the workshop's running costs, such as rent, power, water and equipment, shared across everything you make.
Most small businesses price from materials alone. That works until rent goes up or you hire a second person, and then the margin disappears without anyone noticing.
Cost per unit = materials + labour + overhead
- Materials
- The cost of every line in the bill of materials.
- Labour
- Hours per batch × cost per hour ÷ units per batch.
- Overhead
- Monthly running costs ÷ units made in a month.
Materials
Start from your bill of materials: every ingredient, jar and label for one unit, with what each costs you. For a 200 ml jar of body butter, that comes to GHS 15.20.
Labour
Time how long a batch takes from start to finish: weighing, mixing, filling, labelling and packing. Then multiply by what that time costs.
A skincare maker in Kumasi makes body butter in batches of 50 jars. Each batch takes two people three hours, and each person costs GHS 25 an hour, including their share of benefits.
- Labour per batch: 2 people × 3 hours × GHS 25 = GHS 150
- Labour per jar: GHS 150 ÷ 50 jars = GHS 3.00
Overhead
Add up a month's running costs and share them across what you make in that month.
- Rent GHS 3,000, power and water GHS 1,200, equipment and other costs GHS 800: GHS 5,000 a month
- About 1,000 jars made a month: GHS 5,000 ÷ 1,000 = GHS 5.00 a jar
If you make several products that take very different amounts of time, share overhead by production hours instead of by units: a product that takes twice as long carries twice the overhead.
Putting it together
Cost of one 200 ml jar of body butter
- Materials
- GHS 15.20
- Labour
- GHS 3.00
- Overhead
- GHS 5.00
- Cost per jar
- GHS 23.20
If you count materials alone, a GHS 40 jar seems to leave GHS 24.80. With labour and overhead included, it leaves GHS 16.80, a margin of 42%. At GHS 23.20 a jar, the business's wholesale price of GHS 30 still pays, but only just.
Costing in Olonka
A manufacturing order in Olonka shows the ingredients cost from the product's bill of materials, the operations cost from its steps, the total cost and the cost per unit. Each operation has a setup time, a run time and a cost per hour, and an operation's cost can be set per hour, per setup, per unit or as a fixed amount.
Labour and overhead go into those operation costs: if you include rent and power in the hourly cost of each step, every order picks up its share. On the product itself, Olonka estimates the profit and margin from the default sales price and the average inventory cost per unit. Roles decide who can see costs and margins. The Make page has more on production in Olonka.
Common mistakes
- Pricing from materials only leaves out labour and overhead, which are real costs and often a third of the total.
- Leaving out the owner's time undercounts labour: your hours cost something, even if you don't pay yourself a wage yet.
- Costing with last year's material prices gets every unit wrong once suppliers change theirs, so update your costs when they do.
- If some of every batch stays in the pot and you leave that out of the materials, each jar costs more than you think.